01 / Acquire
Capacity, in whatever form it is held
Energized sites, interconnection positions, half-built projects, assignable host agreements, and commercial property sitting on service it never draws.
Family office · Permanent capital · Owner-operator
Solela acquires excess and underused electrical capacity — overbuilt commercial service, stranded interconnections, dark charging sites — and monetizes it through energy storage, advanced charging, and emerging high-density load.

The asset
Across commercial and industrial America, electrical service is routinely installed for a peak that never arrives. A building sized for 2,000 kVA draws 640. A charging site built by a failed operator sits energized and dark. A developer holds an approved interconnection they will never build against. In every case the expensive, slow, irreplaceable part — capacity delivered to a specific piece of ground — already exists and earns nothing.
The utility will not buy it back. The property owner cannot monetize it alone. And a new entrant will spend twelve to thirty months in an interconnection queue to build what is already sitting unused a mile away.
How we monetize it
01
Time-shift the power, cut the demand charge, and sell the flexibility back to the utility. The anchor asset on almost every site we buy.
Storage →02
Tesla Supercharger hardware under Tesla's own operations, fleet depots, and heavy-duty charging wherever the installed service will carry it.
Charging →03
High-density compute, microgrids and bidirectional systems — the markets paying the most for power that has already been delivered.
Emerging →What we do
01 / Acquire
Energized sites, interconnection positions, half-built projects, assignable host agreements, and commercial property sitting on service it never draws.
02 / Activate
A battery sized against measured load makes the capacity dispatchable. Charging and emerging load are then placed on top of it.
03 / Hold
We operate what we buy. Dispatch, demand-charge management, host economics and insurance stay with us for the life of the asset.
The market, in public numbers
12–30 mo
Typical wait for new commercial interconnection in most US utility territories
~$940k
Tesla's published all-in cost for a new eight-stall V4 Supercharger site
$8B → $146M
ChargePoint's market capitalization, 2021 to February 2026. It is not the only one.
Charging figures are Tesla's own published Supercharger for Business numbers and describe a greenfield build. Our basis is lower because we are not paying to deliver power that has already been delivered.
Work with us
Sellers
Receivers, lenders, estates, corporate parents unwinding a program, developers with an interconnection they will never use.
Acquisitions →Property owners
We fund, build, own, operate and insure the asset that monetizes your headroom, and pay you for it.
For hosts →Address, utility, service size, peak demand, and what is on the ground today. That is enough for a first answer.
01 — Thesis
Capacity delivered to a specific piece of ground is expensive to create, slow to permit, and impossible to move. When the load it was built for never arrives, it becomes the cheapest megawatt in the market.
Where it sits
01
Service sized for a tenant mix, a production line, or an expansion that never came. The headroom is permanent and the property owner is already paying to have it there.
02
Energized service with dead or removed hardware, left behind by an operator that failed. The meter still works.
03
Filed, studied, approved and never built. A position in a utility queue has real value to a party that can actually use it.
04
The conductor that is tight at two in the afternoon is empty at two in the morning. Most commercial service is underused for two-thirds of every day.
05
Make-ready complete, equipment never installed. The slow and expensive work is paid for; the fast and cheap work is not.
06
Solar and cogeneration that is curtailed, exported at a poor rate, or simply larger than the host's load ever required.
Why it stays stranded
None of this is a secret, and it is not a technology problem. It persists because of who holds what. A property owner has capacity but no reason to become an energy operator. A receiver holding a failed charging portfolio wants cash, not a development programme. A utility has no mechanism to buy back headroom it has already sold. And the developers with the operating capability are usually deploying a fund that was raised against greenfield projects, because that is what their capital was raised to do.
We sit in that gap. We buy the capacity outright, with our own money, and we operate it ourselves.
The arbitrage
Building new capacity means a service application, a study, a transformer, switchgear, trenching, conduit, restoration, permitting and utility coordination. On a new eight-stall Supercharger site, Tesla's own published numbers put installation at $440,000 against $500,000 of hardware — and that installation half is where nearly all of the calendar time lives.
On an acquired site, that scope is already in the ground and was paid for by someone who is no longer in a position to use it. We pay a distressed price for it and spend our capital on the revenue-producing equipment instead.
What we do with it
Storage comes first on nearly every site, because a battery is what converts raw headroom into dispatchable capacity and because its anchor revenue — demand-charge reduction — is contractual rather than speculative. Charging and emerging load are then placed on top of a site that already works without them.
01
Time-shift the power, cut the demand charge, and sell the flexibility back to the utility. The anchor asset on almost every site we buy.
Storage →02
Tesla Supercharger hardware under Tesla's own operations, fleet depots, and heavy-duty charging wherever the installed service will carry it.
Charging →03
High-density compute, microgrids and bidirectional systems — the markets paying the most for power that has already been delivered.
Emerging →Why patient capital
These assets take time. Utilization on a repowered site builds over years as the local load mix shifts, and a storage asset earns across tariff cycles that do not care about a vintage year. A ten-year fund underwrites to an exit; we underwrite to an operating life.
It also changes what we can buy. A seller who needs certainty in two weeks is not running a competitive process. We can be the party that closes, and that is frequently worth more to them than the last increment of price.
Our criteria, what we need from a seller, and how a deal actually runs.
02 — Acquisitions
We buy excess electrical capacity in whatever form it is held. We underwrite in-house, give a fast answer either way, and hardware condition is never a disqualifier.
What we buy
Industrial and commercial property whose installed service substantially exceeds its peak draw. We buy a capacity easement or ground lease; you keep the building.
Energized service with dead or removed equipment. Often the best basis available anywhere in the market.
Running locations with poor economics, unreliable hardware, or an operator exiting the market.
Filed, approved or energized service a developer will not use. We will buy the position on its own.
Make-ready complete, equipment never installed. Permits and interconnection already carried.
Receivership, bankruptcy estates, and corporate parents unwinding a program across several states.
What these look like



Criteria
Process
STEP 01
Address, utility, service size, recent peak demand, interconnection status, site control, and what is physically on the ground. A one-page summary is enough to start.
STEP 02
We model tariff, demand-charge exposure, available headroom, and replacement cost of the in-place infrastructure. You get an indication or a pass, typically within a week.
STEP 03
Title, survey, environmental, utility records and interval data, as-builts, equipment condition, and the host or lease documents. In-house, no financing contingency.
STEP 04
Asset purchase, entity purchase, lease assignment, or a direct agreement with the property owner. Cash. We can run a two-week timeline when the situation requires it.
STEP 05
Storage, then charging or load, commissioned against the existing service. The seller is done at close.
03 — Energy storage
Storage is the first asset on nearly every site we buy. It converts raw electrical headroom into dispatchable power, and its anchor revenue is contractual rather than speculative.
The problem it solves
Commercial tariffs bill on the highest fifteen-minute draw in the month. Put any serious load on a site — charging, compute, process equipment — and a brief coincident peak can set a charge that the site's revenue will never recover, billed every month afterwards whether or not it happens again.
At low utilization, which is where every activated site starts, this is the single largest line item and the reason so many charging businesses never reached contribution margin. It is a solvable engineering problem that was widely treated as a market problem.
The value stack
01
The battery absorbs the peak so the site is billed closer to its average draw instead of its worst fifteen minutes. This is the anchor value and it is available on day one.
02
Charge during off-peak and overnight windows, discharge into expensive hours and into the site load itself.
03
Enrolled wherever the utility or ISO pays for dispatchable load, capacity, or peak-day curtailment.
04
Backup for critical load behind the host's meter. Frequently the reason a property owner signs at all.
05
Storage lets a site deliver peak power without requesting a service upgrade, which keeps the project out of the utility queue entirely.
06
Market participation where the ISO permits it and the site's size and location justify the overhead.
How we size
01
We pull utility interval data for the premise where it exists and meter the site where it does not. Sizing from a nameplate assumption is how storage projects end up oversized and uneconomic.
02
Demand ratchets, time-of-use windows, seasonal schedules and standby charges all change the answer. The same battery is a good investment on one tariff and a bad one two counties over.
03
Demand-charge savings are contractual and carry the base case. Arbitrage and program revenue are modeled separately and are never required for the deal to work.
04
Dispatch stays in-house for the life of the asset, because the value of a battery is almost entirely in how it is operated.
Send us the interval data and the tariff. We will model it.
04 — Advanced charging
Third-party-owned Tesla Supercharger sites, fleet depots, and heavy-duty charging — placed on service that already exists.
Supercharger for Business
Since late 2025, Tesla has allowed third parties to purchase Supercharger hardware and own the asset while Tesla continues to run it on its own network. The site appears natively in Tesla's navigation, bills through Tesla, and is maintained by Tesla. The first third-party-owned, Tesla-operated Supercharger in North America opened in Land O' Lakes, Florida, with eight V4 stalls owned by the host.
Driver trust and discoverability are the two things an activated site cannot manufacture for itself. Tesla supplies both. We supply the capital, the real estate and the power underneath it.
Hardware, eight V4 posts
$500,000
Installation per post, medium tier
$55,000
All-in for a new 8-stall V4 site
~$940,000
Tesla's all-inclusive operating fee
$0.10 / kWh
Uptime commitment, Tesla-operated
97%
Modeled payback, US markets
4–7 yrs

Where we site
Distribution centers, last-mile depots and yards with heavy service already installed and long idle windows.
Dwell time, existing parking fields, and a host that benefits directly from the traffic.
Hotels and destinations where charging is an amenity and overnight load is cheap.
Multi-tenant sites with spare capacity and a landlord looking for incremental revenue.
Public fleets converting, often with service sized years ahead of their actual need.
Megawatt-class charging needs service almost no greenfield site can deliver. Sites that already have it are scarce.
Demand charges are what break charging at low utilization. Storage is the fix.
05 — Emerging load
Storage and charging are the two we underwrite on every site today. The third category is where capacity already in the ground meets demand that cannot wait in an interconnection queue.
Categories
01
AI and inference load is constrained by power, not by silicon or by real estate. A site with installed service, a storage asset to firm it, and an owner who can move quickly is worth considerably more to a compute tenant than a greenfield parcel holding a multi-year queue position. We evaluate co-location on every site whose service supports it.
02
Where a host carries critical load, the same storage asset that manages demand charges can be islanded. Cold storage, grocery, healthcare and data-adjacent tenants pay for that directly, and it is contracted revenue rather than market revenue.
03
Depot fleets sit still for sixteen hours a day. That is a storage asset somebody else has already paid for. As bidirectional hardware matures and warranties follow it, those vehicles become part of the stack on sites we already own.
04
Heavy-duty corridors require service levels almost no site can deliver on a new interconnection. The small number of properties that already have that service are scarce, and we buy them.
Discipline
A new technology enters our underwriting on three conditions. The hardware must be commercially available from a manufacturer that stands behind it. The revenue must be contracted rather than speculative. And the downside case must be that we fall back to storage and charging on a site we would have been happy to own anyway.
That last condition is the important one. We do not buy a site because of what might be placed on it. We buy it because the capacity is mispriced, and then we put the highest-paying use on top.
If you need capacity faster than a utility queue can deliver it, we may already own it.
06 — For property owners
If your property carries electrical capacity you are not using, we will fund, build, own and operate the asset that monetizes it — and pay you for the privilege.

The arrangement
Make-ready, trenching, switchgear, storage, hardware, and restoration of your parking field.
Uptime, maintenance, dispatch, pricing and support are not your problem and never become your problem.
Service applications, tariff selection, interconnection and inspections all run through us.
Ground rent, a share of site revenue, or a combination — structured to your preference for certainty versus upside.
Where the battery is sized for it, backup for critical load behind your meter during an outage.
We are buying the headroom on your service, not your property and not your operation.
Structures
A
Fixed rent for a defined area and capacity easement, escalating annually. Most certainty for the host, least upside.
B
A percentage of site revenue with a floor. The host participates as utilization and load value grow.
C
Reduced rent in exchange for dedicated backup capacity for the host's critical load. Common with cold storage, grocery and healthcare tenants.
What makes a good host site
Send a recent bill and a site plan. We can tell you quickly whether your service has room to monetize.
07 — The firm
Solela is a single-family vehicle. We are not raising, we are not deploying committed capital against a fund life, and nobody is going to ask us to sell in year seven.
Structure
Most buyers in this market are funds. A fund has a vintage, a deployment window, a hold period and an exit obligation, and every one of those constrains what it can underwrite. It cannot buy an asset that looks wrong for twenty-four months. It cannot sit on an interconnection position for three years waiting for the surrounding load to arrive. It frequently cannot close in two weeks because its investment committee does not meet in two weeks.
We have none of those constraints, and in a distressed market that is worth more than a lower cost of capital.
20 yr
Hold period we underwrite to, not a fund term
2 wk
Close when the situation requires it
100%
Of equity from a single family. No LPs, no committee.
How we underwrite
01
We underwrite to replacement cost of the capacity that is physically in the ground. If an asset only works on a utilization forecast, we pass.
02
Demand-charge savings and ground rent are contractual. Arbitrage, program revenue and emerging load are upside, modeled separately.
03
Proven hardware, supported by its manufacturer. We are an infrastructure owner, not an early adopter.
04
Dispatch and asset management stay in-house. Outsourcing the operating decision on a storage asset gives away most of its value.
What we do not do
Leadership
Principal biography, background and prior transactions go here. This is the one section a seller or host will read most carefully — it should carry real names and a real track record.
No intermediaries, no process. The people who decide are the people who answer.
08 — Contact
Address, utility, service size, recent peak demand, and what is on the ground today. That is enough for a first answer.
Direct
acquisitions@solela.comFor host, property and emerging-load enquiries, the same address reaches us. We read everything that comes in and reply either way.
Coverage
We review sites nationally and have no minimum transaction size for a single location. Portfolios and estate situations are welcome.
Site submission
Ready to send
This page cannot send mail on your behalf. Copy the summary below and email it to acquisitions@solela.com.